Home | About us | Consilium
Divitel Logo
Operational test lab

Operational test lab

At Divitel system errors can be simulated in the operational test lab. Also new technical systems can be pretested. This includes a FAT (factory acceptance test) before it will be delivered to the client.

Simulating in test lab & FAT (factory acceptance test)

Real Time Web Analytics